Importation of new rails |
Unloading on the quays of the port of Douala |
| OFFICIAL CEREMONY OF LAUNCHING OF THE WORK OF RENEWAL OF THE WAY BETWEEN BELABO AND KA'A" ON SEPTEMBER 11, 2004 |
 |
 |
| This work requires an important technicality. |
 |
 |
Semi-mechanized raking of the way |
Pose of the rails with the carriage platelayers |
 |
 |
Fixing of the new way |
Heavy mechanical stuffing |
 |
 |
Control rail by ultrasound |
Check geometrical parameters of the way
by Rail-Car M-462 |
For the period being spread out of 2007 to 2014, the priority investment plan of Camrail envisages the renewal of the way on the following sections :
DIBAMBA – MAKONDO (66 km)
BATCHENGA – KAA (126 km)
|